Case Study: Maritime Transport Normanton – Enhancing Logistics Efficiency with JLM Energy
Project Overview
Maritime Transport, one of the UK’s leading intermodal logistics companies, partnered with JLM Energy to execute a comprehensive programme of mechanical, electrical, and safety-security upgrades at its satellite drivers’ hub in Normanton, near Wakefield, West Yorkshire. The project aimed to enhance operational efficiency, safety, and sustainability, ensuring the facility meets the growing demands of modern logistics operations.
Project Details
- Client: Maritime Transport
- Location: Normanton, near Wakefield, West Yorkshire
- Sector: Logistics & Transportation
- Project Value: £500,000
- Contract Period: 3.5 months
Project Scope & Deliverables
JLM Energy delivered a turnkey solution, improving the mechanical, electrical, and security infrastructure at the Normanton hub. These upgrades were crucial to support the round-the-clock operations of Maritime Transport.
Mechanical Services
- Heating, Ventilation, and Air Conditioning (HVAC) – Installed modern climate control systems to create a comfortable and efficient working environment.
- Plumbing Systems – Ensured a reliable water supply and efficient waste management to support staff facilities and daily operations.
Electrical Services
- Power Distribution Systems – Designed and implemented efficient electrical networks to power logistics and support systems.
- Energy-Efficient Lighting – Installed LED lighting solutions to improve visibility, reduce energy consumption, and enhance safety.
Safety & Security Enhancements
- Fire Detection & Alarm Systems – Installed advanced fire safety solutions to ensure compliance with industry safety regulations.
- Security Systems & Access Control – Implemented high-tech surveillance and security measures to safeguard the facility.
Challenges & Solutions
The biggest challenge was ensuring that the upgrades were completed without disrupting the hub’s 24/7 operations. JLM Energy:
✅ Scheduled work during off-peak hours to avoid interruptions.
✅ Implemented a phased installation plan to maintain operational efficiency.
✅ Worked closely with Maritime Transport’s management to align project timelines with business needs.
Results & Impact
- Increased Operational Efficiency – The upgraded systems improved facility performance, supporting logistics and distribution operations.
- Enhanced Safety & Compliance – The facility now meets the highest standards for fire safety, security, and mechanical reliability.
- Optimised Energy Use – The introduction of energy-efficient solutions has lowered overall operational costs.
Expanding Our Work with Maritime Transport
This project is part of a broader collaboration between JLM Energy and Maritime Transport to improve logistics hubs across the UK. We have also completed similar upgrades at Maritime Transport Trafford, further supporting sustainable and efficient transport infrastructure.
JLM Energy: Powering the Future of Logistics Infrastructure
By delivering specialist mechanical, electrical, and security solutions, JLM Energy continues to help leading logistics companies like Maritime Transport optimise operations, reduce costs, and improve safety standards.
🔹 Looking to upgrade your transport or logistics facility? Contact JLM Energy today.